Capability blueprint — Manufacturing (MES)

Shop-Floor Execution System

blueprint · shop-floor MES

CAPABILITY BLUEPRINTA reference architecture for this sector: how TEKTON would engineer the system, drawn from what our survey engine measures in estates like it. It is not a client engagement, no client is named or implied, and the interface above shows illustrative data.

THE CHALLENGE

Regional plants often schedule from spreadsheets and ageing on-premises screens that disagree with each other and stop when the network does. The floor needs one schedule, live machine states and a system that keeps working offline and syncs when the line comes back.

THE ARCHITECTURE

01

Machine data

  • Spindle state and cycle counts from CNC controllers (MTConnect or OPC UA)
  • Uptime, availability and downtime reasons per machine and shift
  • Operator downtime codes captured at the machine

02

Scheduling

  • One relational schedule across sites and cells
  • Drag-to-reschedule with capacity and tooling checks
  • Works orders kept in step with the ERP

03

On the floor

  • Offline-first tablet app that queues changes and syncs
  • Role-based access for planners, setters and supervisors
  • Shift handover and OEE reports

TECHNOLOGY

MachinesMTConnect / OPC UA adapters
SyncOffline-first client store with conflict-safe sync
DataPostgreSQL, row-level security per site
IntegrationERP connectors (e.g. Epicor Kinetic REST)
Front endNext.js dashboard and installable tablet app

WHERE IT STARTS

A reference architecture, not a client engagement. Every engagement starts with a survey of the existing estate.